Mucha Construción

I’m often asked: Is it changing?

Hell yeah!

In Habana Vieja and Centro Habana there are many ongoing construction projects, including building new hotels and refurbishing or rebuilding old hotels.

For the past year there has been a concerted effort to upgrade the electric service by removing the wires from sidewalks and them placing underground. Also the water lines are being replaced with new plastic pipe.

_84a3874-tifa_b_c_e_fused-copy

_84a3848-tifa_b_c_fused-copy

_84a3868-tifa_b_c_d_fused-copy

 

As a side note: There is no water pressure in the homes as we know it. The water is supplied to the streets by the government. The people then have to pump the water to cisterns or plastic tanks on the roofs of their buildings. From here it is gravity fed to kitchens and baths in people’s apartments.

Of course the haphazard trench digging down the middle of heavily used streets creates problems. Garbage cannot be collected and people have  nowhere to safely walk.

_mg_0221-tifa_b_c_d_fused-copy

_84a3479-tifa_b_c_fused-copy

_mg_0217-tifa_b_c_d_fused-copy

I did find some children who were having a good time though. They were playing in some fresh, clean sand used to bury the lines.

_mg_0240-copy

_mg_0233-copy

_mg_0239-copy

2 thoughts on “Mucha Construción”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s